AMG POTASH · EASTERN PILBARA, WESTERN AUSTRALIA

Long-life, low‑cost SOP in a tier‑one jurisdiction

The investment case →360° PLANT TOUR
5.13 Mt
Ore Reserve
13.15 kg/m³ SOP
32.98 Mt
Total Mineral Resource
M 4.60 · I 15.11 · Inf 13.27
50 yrs
Life of Mine
multi-decade supply
250–300
ktpa SOP
steady-state capacity
91%
Potassium recovery
446 ha evaporation ponds
SOURCE: JORC 2012 ORE RESERVE & MINERAL RESOURCE · FEASIBILITY STUDIES

Why Beyondie

A flagship brine-hosted SOP development backed by a high-grade subsurface brine deposit, proven solar evaporation technology and established infrastructure.

01
Scale
32.98 Mt Total Mineral Resource and a 5.13 Mt Ore Reserve at 13.15 kg/m³ SOP.
02
Longevity
Engineered for a 50-year Life of Mine, ensuring long-term supply stability.
03
Cost
Solar-driven concentration targeting first-quartile cost competitiveness.
04
Infrastructure
Dedicated 79 km gas lateral connected to the Goldfields Gas Pipeline.
Beyondie processing plant, aerial view
PROCESS

Solar-driven, from brine to premium SOP

446 ha
primary evaporation ponds
91%
overall potassium recovery
79 km
gas lateral to the Goldfields Gas Pipeline
Explore the project →
PROJECT STATUS
LATEST ANNOUNCEMENTS
All →
Interested in Beyondie? Speak with investor relations.
Contact IR →